Image 1 of 1

20140725gs_6578_Tongaat_Inquiry.jpg

Add to Cart Add to Lightbox Download
DURBAN - 25 July 2014 - Heavy machinery breaks up a beam to allow a number of other engineers and company officials to determine how much steel was used in a beam that collapsed at the ill-fated Tongaat Mall. The mall being constructed by Gralio Precast collapsed before it was completed killing twoconstruction workers and injuring 29 on November 19, 2013. Controversial Durban businessman Jay Singh (clue jeans and checked shirt in this image) runs Gralio. Picture: Allied Picture Press/APP
Copyright
Giordano Stolley 2014
Image Size
3445x2297 / 2.6MB
http://www.alliedpicturepress.com
Contained in galleries
News
DURBAN - 25 July 2014 - Heavy machinery breaks up a beam to allow a number of other engineers and company officials to determine how much steel was used in a beam that collapsed at the ill-fated Tongaat Mall. The mall being constructed by Gralio Precast collapsed before it was completed killing twoconstruction workers  and injuring 29 on November 19, 2013. Controversial Durban businessman Jay Singh (clue jeans and checked shirt in this image) runs Gralio. Picture: Allied Picture Press/APP